Hints/en

From virtonomics
Revision as of 19:00, 10 November 2022 by Diska (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


SPECIAL CONDITIONS OF CONTRACTS

When concluding a contract, you can specify the limit of the price increase by the supplier as a percentage per turn, or the absolute value of the price.

By default, when ordering from third-party suppliers, a limit of 10% of the current price per turn and *3 of the price at the time of conclusion of the contract in absolute terms is set. When ordering from your own departments, there are no limits.

You can also set a limit on the quality of products, if the specified threshold is lowered, the delivery will also not be carried out.


MINE

Base quality mined materials is the basic quality of the raw materials in the mine (it can be any within a city). After the mine is created, this parameter cannot be changed, graded from 1 (bad) to 5 (good) in increments of 0.25. This indicator, along with technology, affects the final quality of products.

Complexity of mining is an indicator characterizing the hard-to-gain materials in a mine and affects energy consumption in mining operations. The volume of extractable raw materials in the certificate is indicated for the complexity of extraction 3. The extracted amount with less complexity increases by 40% (power function) for each level, with greater complexity - it decreases by the same amount.

Field resources - the amount of raw materials in the field. Reserves can be replenished for game points through the function - Exploration.


Construction waste disposal

The construction expense item - Construction waste disposal - is provided to limit the mass construction of units and distortions in political algorithms.

Additional costs are charged in three cases:

  • from companies that simultaneously build or improve more than 30 enterprises of the same class in one city. For each enterprise over 30, a 2% penalty is charged to the total paid cost of building problem enterprises on an accrual basis. Mines and oil rigs are not taken into account in the calculation.
  • from companies with more than 20 leased enterprises of the same class in the same city. For each enterprise over 20, a 5% penalty is charged to the total paid cost of renting problematic enterprises on an accrual basis. Offices, Warehouses and Regional business centers are not taken into account when calculating.
  • from companies with more than 30 power plants (of any type) in one city with a total nominal capacity of more than 25,000 MW. For each power plant in excess of 30, a 3% penalty is charged to the conditional total "general production costs" of troubled enterprises on an accrual basis. Conditional overhead costs depend only on the rated power of the power plant and are calculated according to the simplified formula 50 * global energy tariff * rated power.